Statement of Service
SR 90 Extension PSR & Admiralty Way Corridor Improvement Traffic Study
Raju Associates was involved in the preparation
of the traffic study for the SR 90 Extension PSR
including initial conceptual design of the
alternatives, assessment of these concepts,
analyses and effectiveness evaluation for the
finalist alternatives carried forward in the PSR,
and traffic impacts assessment incorporated in
the environmental document prepared for this
study effort. Raju Associates worked closely
with the Los Angeles County Department of Public
Works as well as Caltrans staff to prepare this
analysis. As part of this evaluation, Raju
Associates also prepared detailed flow and
queuing analysis using a micro-simulation
package (NetSim) both with and without this
improvement for Caltrans benefit.
Concurrent with the SR 90 PSR traffic analysis,
Raju Associates was also involved in the
preparation of a traffic study to evaluate
Admiralty Way Corridor improvement alternatives.
Admiralty Way is a key arterial facility
providing access to all existing and potential
future developments in Marina del Rey, CA, and
the proposed improvements evaluated along this
corridor complement the SR 90 extension project
well. Raju Associates prepared future year
forecasts using a sub-regional travel demand
forecasting model and evaluated all the key
intersection’s operations. Required improvements
were determined to improve the mobility of
people along this travel corridor and these
improvements were tested to ensure required
effectiveness. Both of these improvements were
recommended to accommodate future growth in
Marina del Rey.
|
|